At some point, all three of them will be under consideration at the same time.
At some point, all three of them will be under consideration at the same time.
If (the vibration) met certain criteria, it caused Entergy to hold the reactor power ascension until their own engineers concluded they could go further. It's safe for them to stay at their current power level. They'll be completing that further analysis.
There also will be an opportunity for the public to request a hearing, and there is a time frame associated with this.
© 2020 Inspirational Stories
© 2020 Inspirational Stories